Transloading System
Project Profile
Ray-mont Logistics required a system that would allow them to simultaneously fill containers from two rail lines at 250MT/hour. The system also ties into an existing bagging line. The completed system has the highest transloading capacity in all of Canada.
Our work included design, engineering, procuring specialized equipment, manufacturing, and complete installation. This project was completed onsite along the Fraser River in some challenging conditions.